The Virginia School for the Deaf and Blind

Campus Wide Repointing

Staunton, Virginia


Project Specifications:

 
  • Size: 450,000 Square Feet

  • Budget: $150,000

  • Completion: May 2014

This project required a campus wide survey of the condition of the mortar joints on all brick and stone surfaces, including buildings and retaining walls. A prioritized list of repairs was developed. Construction documents were created to address the maximum number of repairs within the stated budget. As a state agency project, all BCOM and state agency protocols were followed for document preparation and project management.

Previous
Previous

VSDB Elevated Walkway Repairs

Next
Next

VSDB Bass Hall Plumbing Repair and Upgrades