The Virginia School for the Deaf and Blind

Bass Hall Plumbing Repair and Upgrades

Staunton, Virginia


Project Specifications:

 
  • Size: 2,300 Square Feet

  • Budget: $100,000

  • Completion: 2013

Lineage was hired to provide architectural and engineering services to the kitchen at Bass Hall. Bass Hall serves as the cafeteria for the school. Upgrades were needed to provide a more efficient and safer environment for staff and students. These upgrades included repairing the “soft” places in the floor and removing barriers for easier travel through the kitchen. All of the upgrades were in accordance with the 2010 ADA guidelines.

Previous
Previous

VSDB Campus Wide Repointing

Next
Next

VSDB Campus Wide Recaulking